{"product_id":"off-grid-solar-kit-6500w-48vdc-120-240vac-lifepo4-10-24kwh-lithium-battery-8-x-450w-solar-panels-sgr-6510e","title":"SunGoldPower Off-Grid Solar Kit 6500W 48VDC 120\/240VAC LifePo4 10.24KWH Lithium Battery 8 X 450W Solar Panels SGR-6510E","description":"\u003cp\u003eThe SGR-6510E is the largest-array version of SunGoldPower's 6500 watt split-phase package. It combines a 6500 watt inverter on a 48V DC bus with a 120V\/240V AC output, eight 450W bifacial N-type monocrystalline panels for a 3600W array, and two 100AH 51.2V LiFePO4 batteries totalling 10.24KWH. The 3600W array is the point of difference: it is over half again what the 370 watt-panel versions of this kit carry, so a greater share of a day's load can be met from generation rather than from the bank. SunGoldPower aims it at cabins, shops and RVs.\u003c\/p\u003e\u003cp\u003eBecause the output is genuine split phase, 240V loads such as a well pump or an electric range are within reach as well as ordinary 120V circuits. The limit to establish first is the output split. The 6500 watt rating is the inverter's total across both legs of the 120\/240V output, and SunGoldPower publishes no per-leg or 120V-only figure anywhere on this page. An all-120V load bank is constrained by what a single leg can carry, and that figure is not stated, so it cannot be inferred from the 6500 watt headline; take it from the inverter manual or from the supplier in writing before sizing anything. The supplier also states that up to six identical inverters can later be paralleled for 120VAC single phase, 240VAC split phase or 208V three phase, which describes a stack of separately purchased inverters rather than this kit. No surge rating, efficiency figure or PV input window is published.\u003c\/p\u003e\u003cp\u003eWhat ships is the inverter, eight panels, two batteries, one 50-foot PV extension cable set, eight sets of mounting Z-brackets, a 160A DC breaker, a 25A PV breaker, two sets of 1\/0 AWG cables for the breaker-to-battery-or-inverter runs, and one 250A busbar. The busbar and the battery cables mean the bank side is reasonably covered. What the supplier does not list, and so is a separate purchase, is mounting rails and any roof or ground-mount frame, PV wiring past the single extension set, a combiner box, conduit, an AC disconnect, a load centre and all AC branch wiring, grounding and bonding hardware, a generator and transfer switch, and every permit, plan set and hour of labour. With eight panels the racking is a substantial cost in its own right, and the AC distribution for a split-phase system is the other large one; price both before comparing this against an installed system.\u003c\/p\u003e\u003ch3\u003eWhat's in the Box\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003e1 X 6500 Watt 48V DC 120V\/240V AC Output inverter\u003c\/li\u003e\n\u003cli\u003e8 X 450W bifacial N-type monocrystalline solar panels\u003c\/li\u003e\n\u003cli\u003e2 X 100AH 51.2V LiFePO4 batteries (10.24KWH total)\u003c\/li\u003e\n\u003cli\u003e1 X 50 Feet solar extension cables for the inverter PV input\u003c\/li\u003e\n\u003cli\u003e8 X Sets of mounting Z-brackets\u003c\/li\u003e\n\u003cli\u003e1 X 160A DC breaker\u003c\/li\u003e\n\u003cli\u003e1 X 25A PV breaker\u003c\/li\u003e\n\u003cli\u003e2 Sets X 1\/0 AWG cables, breaker to battery or inverter connection\u003c\/li\u003e\n\u003cli\u003e1 Set X 250A busbar\u003c\/li\u003e\n\u003c\/ul\u003e\u003ch3\u003eNot Included\u003c\/h3\u003e\u003cul\u003e\n\u003cli\u003ePanel mounting rails, racking, and any roof-mount or ground-mount frame. The Z-brackets supplied are panel attachment brackets only, not a mounting structure.\u003c\/li\u003e\n\u003cli\u003ePV wiring beyond the single 50-foot extension cable set, including any additional MC4 extensions, home runs, or a combiner box.\u003c\/li\u003e\n\u003cli\u003eConduit, raceway, junction boxes, and weatherproof penetrations.\u003c\/li\u003e\n\u003cli\u003eAC-side equipment: a load centre or breaker panel, an AC disconnect, AC branch wiring, receptacles, and any transfer switch.\u003c\/li\u003e\n\u003cli\u003eGrounding and bonding hardware, ground rods, and lugs.\u003c\/li\u003e\n\u003cli\u003eA generator, and any generator wiring or controls.\u003c\/li\u003e\n\u003cli\u003ePermits, stamped plan sets, engineering, inspection, and installation labour.\u003c\/li\u003e\n\u003cli\u003eA battery rack or enclosure.\u003c\/li\u003e\n\u003cli\u003eA standalone solar charge controller. PV connects to the inverter's own input, and no separate controller ships.\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"SunGoldPower","offers":[{"title":"Default Title","offer_id":68055538073791,"sku":"SGR-6510E","price":4959.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0708\/1967\/6351\/files\/SGR-6510E_f38c7f75-88b3-4cec-9a98-254540447a25.jpg?v=1795099879","url":"https:\/\/adventuremotion.com\/products\/off-grid-solar-kit-6500w-48vdc-120-240vac-lifepo4-10-24kwh-lithium-battery-8-x-450w-solar-panels-sgr-6510e","provider":"Adventure Motion","version":"1.0","type":"link"}